A Systematic Review of Project Risk in Construction Projects

Document Type : Original Article

Authors
1 Master of Civil Engineering, Mercu Buana University, Jakarta, Indonesia
2 Master of Industrial Engineering, Mercu Buana University, Jakarta, Infonesia
Abstract
In recent years, numerous studies published in various journals have highlighted the critical importance of understanding project risk in construction projects. Construction projects are inherently susceptible to a multitude of risks, which can significantly impact their success. This systematic review conduct in three study steps, first step is primary research with predefined keyword of project risk in construction projects, second rapid abstract review to identify appropriate in scope papers, and last step by doing full in-depth review to synthesize and summarize the results. Category of the identified risks are grouped into several key areas, including risk identification, assessment, response strategies, and monitoring practices. It highlights that most major projects have risks that require thorough analysis and mitigation strategies to ensure successful outcomes. Effective risk management techniques are essential for minimizing potential threats and fostering a culture of continuous improvement and collaboration among stakeholders. The findings reveal that organizations must adopt a proactive approach to risk management, emphasizing the importance of training and development to equip teams with the necessary skills to navigate complex project environments. By implementing robust risk analysis and mitigation strategies, construction organizations can enhance project performance and resilience. Ultimately, this review contributes to the understanding of project risk dynamics in construction and provides a foundation for future research aimed at refining risk management practices within the industry.
Keywords

1- I. P. I Ketut Yasa Dharmika1, GAP. Candra Dharmayanti2 and Abstrak, “Jurnal Spektran RISK MANAGEMENT IN HOTEL EXTENSION DEVELOPMENT WHICH THE HOTEL Jurnal Spektran,” vol. 3, no. 2, pp. 47–56, 2015.
2-F. W. Iribaram and Mi. Huda, “Analisa Resiko Biaya Dan Waktu Konstruksi Pada Proyek Pembangunan Apartemen Biz Square Rungkut Surabaya,” Axial  J. Rekayasa Dan Manaj. Konstr., vol. 6, no. 3, p. 141, 2019, doi: 10.30742/axial.v6i3.542.
30-E. S. Utomo, R. R. Putradi, H. P. Chandra, and C. Kusumastuti, “Manajemen Risiko Proyek Konstruksi Perbaikan Dermaga di Kota Gresik,” J. Dimens. Pratama Tek. Sipil, vol. 8, no. 2, pp. 115–121, 2019.
4-M. A. Apriliyani, “Analisa Keterlambatan Berbasis Manajemen Risiko Pada Proyek Warehouse Lazada Tahap 2,” Rekayasa Sipil, vol. 8, no. 2, p. 58, 2020, doi: 10.22441//jrs.2019.v08.i2.02.
5-R. Sugiharto, “Analisis Faktor-Faktor Dominanmanajemen Risiko,” vol. 1, no. September, pp. 1–11, 2020.
6-I. Ismael, “KETERLAMBATAN PROYEK KONSTRUKSI GEDUNG FAKTOR PENYEBAB DAN TINDAKAN PENCEGAHANNYA Oleh,” Februari J. Momentum, vol. 14, no. 1, pp. 46–56, 2013.
7-S. Kiswati and U. Chasanah, “Analisis Konsultan Manajemen Konstruksi Terhadap Penerapan Manajemen Waktu Pada Pembangunan Rumah Sakit Di Jawa Tengah,” Neo Tek., vol. 5, no. 1, 2019, doi: 10.37760/neoteknika.v5i1.1367.
8-W. Muka and A. Wibowo, “Penerapan Manajemen Risiko ... (I Wayan Muka, Agung Wibowo) PENERAPAN MANAJEMEN RISIKO PADA PROSES PENGEMBANGAN PROPERTI Implementation of Risk Management on Property Development Process,” J. Pemukim., vol. 16, no. 1, pp. 31–40, 2021.
9- and R. M. R. P. 2 Debalina Banerjee Chattapadhyay 1, Jagadeesh Putta 1, “Risk Identification, Assessments, and Prediction for Mega Construction Projects: A Risk Prediction Paradigm Based on Cross Analytical-Machine Learning Model,” 2021.
10-A. T. Ibrahim, A. Sirajo, and A. H. Ibrahim, “The Effects of Delay and Time Management Building Construction : A Review,” vol. 3, no. 4, pp. 628–632, 2022, doi: 10.51542/ijscia.v3i4.29.
11-L. C. Siang, A. S. Ali, and K. Lumpur, “IMPLEMENTATION OF RISK MANAGEMENT IN THE MALAYSIAN CONSTRUCTION INDUSTRY Lee Chun Siang and Azlan Shah Ali,” vol. 3, no. 1, pp. 1–15, 2012.
12-T. Hutari, S. Hang, and T. Pekanbaru, “Analisis Risiko Pada Pekerjaan Lifting And Rigging Dengan Menggunakan Metode Hirarc Di Pt . Sumi Gita Jaya Minas Tahun 2020,” vol. 1, no. 1, pp. 10–19, 2022.
13-B. P. Sekar Arum Pratiwi, “MANAJEMEN RISIKO PADA PEKERJAAN BETON PROYEK PEMBANGUNAN BENDUNGAN JLANTAH,” vol. 3, no. 3, pp. 220–226, 2023.
14-R. A. Agus, D. K. Octaviani, and A. Azis, “Analisis Faktor Penyebab Risiko Pembengkakan Biaya Pada Proyek Konstruksi Terhadap Kontraktor Pada Penggunaan Kontrak Lumpsum Dan Unit Price Di Kota Makassar Menggunakan Metode Analytichal Hierarchy Process ( AHP ),” vol. 2, no. 1, pp. 37–50, 2022.
15-M. U. Nurjanah, S. W. Astuti, and M. Nurhadi, “Analisis Risiko Pekerjaan Erection Jembatan Kereta Api Menggunakan Metode Fuzzy FMEA,” vol. 8, no. 1, pp. 163–170, 2024.
16-I. G. S. Wibawa, I. M. A. Santiana, I. M. T. Yasa, and I. W. Suasira, “Faktor-Faktor Risiko Terhadap Keterlambatan Proyek Konstruksi di Wilayah Denpasar , Bali Risk Factors to the Delay of Construction Projects in Denpasar , Bali,” vol. 1, 2021, doi: 10.30595/pspfs.v1i.154.
17-R. Rizki et al., “Analisis risiko pelaksanaan perawatan landas pacu bandar udara sam ratulangi manado,” vol. 10, no. 1, 2020.
18-J. E. E. Tumimomor and H. Manalip, “Analisis resiko pada konstruksi jembatan di sulawesi utara,” vol. 6, no. 2, pp. 235–241, 2014.
19-R. Pratama and M. Jamil, “KAJIAN IDENTIFIKASI RISIKO TERHADAP PERUSAHAAN ASPHALT MIXING PLANT ( AMP ) YANG BERADA DI WILAYAH,” vol. 4, no. 2, pp. 127–133, 2022.
20-A. J. Perrenoud, D. Ph, J. B. Smithwick, K. C. Hurtado, K. T. Sullivan, and D. Ph, “Project Risk Distribution during the Construction Phase of Small Building Projects,” no. 1995, pp. 1–7, 2006, doi: 10.1061/(ASCE)ME.1943-5479.
21-A. Shrestha et al., “Risk Allocation Inefficiencies in Chinese PPP Water Projects,” vol. 144, no. 4, pp. 1–10, 2018, doi: 10.1061/(ASCE)CO.1943-7862.0001457.
22-R. Sanggawuri and M. Handajani, “Penerapan Manajemen Resiko pada Pembangunan Proyek Perpanjangan Dermaga log ( Studi Kasus : Pelabuhan DalamTanjung Emas Semarang ),” vol. 25, no. 2, pp. 209–220, 2019.
23-F. M. Arain and D. Ph, “Cost and Schedule Risk Analysis of Bridge Construction in Pakistan : Establishing Risk Guidelines,” no. Arain, 2008, doi: 10.1061/(ASCE)CO.1943-7862.0000857.
24-K. Cho, T. Kim, and T. Hong, “Estimating a Risk-Integrated Schedule Delay for an Office Building Renovation Project by Considering the Project ’ s Attributes,” vol. 36, no. 2, pp. 1–14, 2020, doi: 10.1061/(ASCE)ME.1943-5479.0000732.
25-P. P. Shrestha et al., “Investigation of Legal Issues in Construction-Manager-at-Risk Projects : Case Study of Airport Projects,” vol. 12, no. 3, pp. 1–11, 2020, doi: 10.1061/(ASCE)LA.1943-4170.0000404.
26-M. Ma, A. A. Firdausi, and H. A. Safarizki, “Risk Management Analysis of Construction Projects on Time Performance”.
27-B. E. Situmorang et al., “Analisis Risiko Pelaksanaan Pembangunan Proyek Konstruksi Bangunan Gedung,” vol. 16, no. 69, pp. 31–36, 2018.
28-J. Ilmiah and W. Pendidikan, “2 1,2,” vol. 8, no. November, pp. 302–310, 2022.
29-S. Haryono and B. Susanty, “Analisis risiko kontrak turnkey pada proyek konstruksi transmisi di Indonesia,” vol. 27, no. 02, pp. 83–94, 2022.
30-M. A. W. Annisa R. Samudra, Jati Utomo Dwi Hatmoko, “ANALISA FAKTOR RISIKO PRIORITAS PADA PROYEK KONSTRUKSI JEMBATAN,” vol. 8, no. 7, 2023.
31-A. F. F. PRATAMA, “Tugas akhir”.
32-D. Conca, F. Bozzoni, and C. G. Lai, “Interdependencies in Seismic Risk Assessment of Seaport Systems : Case Study at Largest Commercial Port in Italy,” vol. 6, no. 2, pp. 1–11, 2020, doi: 10.1061/AJRUA6.0001043.