1- I. P. I Ketut Yasa Dharmika1, GAP. Candra Dharmayanti2 and Abstrak, “Jurnal Spektran RISK MANAGEMENT IN HOTEL EXTENSION DEVELOPMENT WHICH THE HOTEL Jurnal Spektran,” vol. 3, no. 2, pp. 47–56, 2015.
2-F. W. Iribaram and Mi. Huda, “Analisa Resiko Biaya Dan Waktu Konstruksi Pada Proyek Pembangunan Apartemen Biz Square Rungkut Surabaya,” Axial J. Rekayasa Dan Manaj. Konstr., vol. 6, no. 3, p. 141, 2019, doi: 10.30742/axial.v6i3.542.
30-E. S. Utomo, R. R. Putradi, H. P. Chandra, and C. Kusumastuti, “Manajemen Risiko Proyek Konstruksi Perbaikan Dermaga di Kota Gresik,” J. Dimens. Pratama Tek. Sipil, vol. 8, no. 2, pp. 115–121, 2019.
4-M. A. Apriliyani, “Analisa Keterlambatan Berbasis Manajemen Risiko Pada Proyek Warehouse Lazada Tahap 2,” Rekayasa Sipil, vol. 8, no. 2, p. 58, 2020, doi: 10.22441//jrs.2019.v08.i2.02.
5-R. Sugiharto, “Analisis Faktor-Faktor Dominanmanajemen Risiko,” vol. 1, no. September, pp. 1–11, 2020.
6-I. Ismael, “KETERLAMBATAN PROYEK KONSTRUKSI GEDUNG FAKTOR PENYEBAB DAN TINDAKAN PENCEGAHANNYA Oleh,” Februari J. Momentum, vol. 14, no. 1, pp. 46–56, 2013.
7-S. Kiswati and U. Chasanah, “Analisis Konsultan Manajemen Konstruksi Terhadap Penerapan Manajemen Waktu Pada Pembangunan Rumah Sakit Di Jawa Tengah,” Neo Tek., vol. 5, no. 1, 2019, doi: 10.37760/neoteknika.v5i1.1367.
8-W. Muka and A. Wibowo, “Penerapan Manajemen Risiko ... (I Wayan Muka, Agung Wibowo) PENERAPAN MANAJEMEN RISIKO PADA PROSES PENGEMBANGAN PROPERTI Implementation of Risk Management on Property Development Process,” J. Pemukim., vol. 16, no. 1, pp. 31–40, 2021.
9- and R. M. R. P. 2 Debalina Banerjee Chattapadhyay 1, Jagadeesh Putta 1, “Risk Identification, Assessments, and Prediction for Mega Construction Projects: A Risk Prediction Paradigm Based on Cross Analytical-Machine Learning Model,” 2021.
10-A. T. Ibrahim, A. Sirajo, and A. H. Ibrahim, “The Effects of Delay and Time Management Building Construction : A Review,” vol. 3, no. 4, pp. 628–632, 2022, doi: 10.51542/ijscia.v3i4.29.
11-L. C. Siang, A. S. Ali, and K. Lumpur, “IMPLEMENTATION OF RISK MANAGEMENT IN THE MALAYSIAN CONSTRUCTION INDUSTRY Lee Chun Siang and Azlan Shah Ali,” vol. 3, no. 1, pp. 1–15, 2012.
12-T. Hutari, S. Hang, and T. Pekanbaru, “Analisis Risiko Pada Pekerjaan Lifting And Rigging Dengan Menggunakan Metode Hirarc Di Pt . Sumi Gita Jaya Minas Tahun 2020,” vol. 1, no. 1, pp. 10–19, 2022.
13-B. P. Sekar Arum Pratiwi, “MANAJEMEN RISIKO PADA PEKERJAAN BETON PROYEK PEMBANGUNAN BENDUNGAN JLANTAH,” vol. 3, no. 3, pp. 220–226, 2023.
14-R. A. Agus, D. K. Octaviani, and A. Azis, “Analisis Faktor Penyebab Risiko Pembengkakan Biaya Pada Proyek Konstruksi Terhadap Kontraktor Pada Penggunaan Kontrak Lumpsum Dan Unit Price Di Kota Makassar Menggunakan Metode Analytichal Hierarchy Process ( AHP ),” vol. 2, no. 1, pp. 37–50, 2022.
15-M. U. Nurjanah, S. W. Astuti, and M. Nurhadi, “Analisis Risiko Pekerjaan Erection Jembatan Kereta Api Menggunakan Metode Fuzzy FMEA,” vol. 8, no. 1, pp. 163–170, 2024.
16-I. G. S. Wibawa, I. M. A. Santiana, I. M. T. Yasa, and I. W. Suasira, “Faktor-Faktor Risiko Terhadap Keterlambatan Proyek Konstruksi di Wilayah Denpasar , Bali Risk Factors to the Delay of Construction Projects in Denpasar , Bali,” vol. 1, 2021, doi: 10.30595/pspfs.v1i.154.
17-R. Rizki et al., “Analisis risiko pelaksanaan perawatan landas pacu bandar udara sam ratulangi manado,” vol. 10, no. 1, 2020.
18-J. E. E. Tumimomor and H. Manalip, “Analisis resiko pada konstruksi jembatan di sulawesi utara,” vol. 6, no. 2, pp. 235–241, 2014.
19-R. Pratama and M. Jamil, “KAJIAN IDENTIFIKASI RISIKO TERHADAP PERUSAHAAN ASPHALT MIXING PLANT ( AMP ) YANG BERADA DI WILAYAH,” vol. 4, no. 2, pp. 127–133, 2022.
20-A. J. Perrenoud, D. Ph, J. B. Smithwick, K. C. Hurtado, K. T. Sullivan, and D. Ph, “Project Risk Distribution during the Construction Phase of Small Building Projects,” no. 1995, pp. 1–7, 2006, doi: 10.1061/(ASCE)ME.1943-5479.
21-A. Shrestha et al., “Risk Allocation Inefficiencies in Chinese PPP Water Projects,” vol. 144, no. 4, pp. 1–10, 2018, doi: 10.1061/(ASCE)CO.1943-7862.0001457.
22-R. Sanggawuri and M. Handajani, “Penerapan Manajemen Resiko pada Pembangunan Proyek Perpanjangan Dermaga log ( Studi Kasus : Pelabuhan DalamTanjung Emas Semarang ),” vol. 25, no. 2, pp. 209–220, 2019.
23-F. M. Arain and D. Ph, “Cost and Schedule Risk Analysis of Bridge Construction in Pakistan : Establishing Risk Guidelines,” no. Arain, 2008, doi: 10.1061/(ASCE)CO.1943-7862.0000857.
24-K. Cho, T. Kim, and T. Hong, “Estimating a Risk-Integrated Schedule Delay for an Office Building Renovation Project by Considering the Project ’ s Attributes,” vol. 36, no. 2, pp. 1–14, 2020, doi: 10.1061/(ASCE)ME.1943-5479.0000732.
25-P. P. Shrestha et al., “Investigation of Legal Issues in Construction-Manager-at-Risk Projects : Case Study of Airport Projects,” vol. 12, no. 3, pp. 1–11, 2020, doi: 10.1061/(ASCE)LA.1943-4170.0000404.
26-M. Ma, A. A. Firdausi, and H. A. Safarizki, “Risk Management Analysis of Construction Projects on Time Performance”.
27-B. E. Situmorang et al., “Analisis Risiko Pelaksanaan Pembangunan Proyek Konstruksi Bangunan Gedung,” vol. 16, no. 69, pp. 31–36, 2018.
28-J. Ilmiah and W. Pendidikan, “2 1,2,” vol. 8, no. November, pp. 302–310, 2022.
29-S. Haryono and B. Susanty, “Analisis risiko kontrak turnkey pada proyek konstruksi transmisi di Indonesia,” vol. 27, no. 02, pp. 83–94, 2022.
30-M. A. W. Annisa R. Samudra, Jati Utomo Dwi Hatmoko, “ANALISA FAKTOR RISIKO PRIORITAS PADA PROYEK KONSTRUKSI JEMBATAN,” vol. 8, no. 7, 2023.
31-A. F. F. PRATAMA, “Tugas akhir”.
32-D. Conca, F. Bozzoni, and C. G. Lai, “Interdependencies in Seismic Risk Assessment of Seaport Systems : Case Study at Largest Commercial Port in Italy,” vol. 6, no. 2, pp. 1–11, 2020, doi: 10.1061/AJRUA6.0001043.