The Acquisition of Tampers Quantity Instead of Compaction Energy in Time Scheduling of Dynamic Compaction

Document Type : Original Article

Authors

1 Ph.D. candidate, Pars Geometry Consultants, IranIran

2 MSc graduate, Kangan Polymer Development, Iran

10.30469/arce.2023.407099.1059

Abstract

A soil exploitation project was introduced and a summary of the obstacles faced in the project was stated. Based on the investigation a compensatory action plan was proposed. The main factors that were considered in developing a compensatory action plan during the revision of the time schedule was discussed. Based on the extensive investigations, tamping quantity was considered as the main determinative factor. The influencing factors was 1) the alteration of the exploitation soil comprising a 50-50 percent of former borrow area and the new borrow area which had the required engineered specifications 2) the proposal of a new pattern for DC. In the compensatory action plan this matter was considered based on the selected pattern by application of total drop quantity to gain a realistic prediction for the schedule plan. 3) As a result of the existence of fine-grained soil in the mix, the time needed for dissipation of excess pore water pressure due to the heavy tamping or heavy seasonal rain between 3 phases and even in each phase alone was considered as a function of tamper quantity. 4) The mobilization of cranes between tamping points linked with tampers quantity based on the DC phases 5) The deficiency of cranes was calculated based on the new compensatory action plan. Since all of these factors’ functionality can be linked to tamping quantity, it was found that this trend is a good way for consideration of parameters that can delay the project and also as a measure for compensatory action plan.

Keywords


1- Dou, J., Chen, J., and Wang, W., 2019, Method for estimating the degree of improvement in soil between adjacent tamping locations under dynamic compaction, International Journal of Geomechanics, 19(12), 04019134.
2- Zhou, C., Yao, K., Rong, Y., Lee, F. H., Zhang, D., Jiang, H., Yang, C., Yao, Z., and Chen, L., 2023, Numerical investigation on zone of improvement for dynamic compaction of sandy ground with high groundwater table, Acta Geotechnica, 18(2), 695-709.
3- Tarawneh, B., Bodour, W. A., Shatnawi, A., and Al Ajmi, K., 2019, Field evaluation and behavior of the soil improved using dynamic replacement, Case Studies in Construction Materials, 10, e00214.
4- Feng, S. J., Tan, K., and Shui, W. H., 2015, Dynamic compaction of ultra-high energy in combination with ground replacement in coastal reclamation areas, Marine Geo resources & Geo technology, 33(2), 109-121.
5- Ghassemi, A., Pak, A., and  Shahir, H., 2010, Numerical study of the coupled hydro-mechanical effects in dynamic compaction of saturated granular soils, Computers and Geotechnics, 37(1-2), 10-24.
6- Jia, M., Zhao, Y., and Zhou, X., 2016, Field studies of dynamic compaction on marine deposits, Marine Georesources & Geotechnology, 34(4), 313-320.
7- Yao, K., Yao, Z. Y., Song, X. G., and Shang, Q. S., 2012, Test study of pore water pressure during dynamic compaction at the subgrade of highway in the Yellow River Flood Area, in:  Advanced Materials Research, Trans Tech Publ, 436-439.
8- Asaka, Y., 2016, Improvement of fine-grained reclaimed ground by dynamic compaction method, Japanese Geotechnical Society Special Publication, 2(59), 2038-2042.
9- Moon, J. S., Jung, H. S., Lee, S., and Kang, S. T., 2019, Ground improvement using dynamic compaction in sabkha deposit, Applied Sciences, 9(12), 2506.
10- Ghorbani, J., Nazem, M., and Carter, J. P., 2020, Dynamic compaction of clays: numerical study based on the mechanics of unsaturated soils, International Journal of Geomechanics, 20(10), 04020195.
11- Hamidi, B., Nikraz, H., and Varaksin, S., 2011, Advances in Dynamic Compaction, in:  Indian Geotechnical Conference IGC2011, 2011.